25-06-2011, 12:57 AM
John's situation is a bit alarming. I can't imagine any of my students submitting a design for a system which has such a catastrophic design flaw - can this really be how these things fail?
To require the unit to be shipped to the USA for the firmware to be re-burned is also outrageous in this day and age.
You haven't had much luck lately John, I'm sorry to say - a brown-out last weekend and a transmitter failure this week. Couldn't blame you if you decided to go Hitech or JR mate.
To require the unit to be shipped to the USA for the firmware to be re-burned is also outrageous in this day and age.
You haven't had much luck lately John, I'm sorry to say - a brown-out last weekend and a transmitter failure this week. Couldn't blame you if you decided to go Hitech or JR mate.
Steve Murray